About the project
What we built
Industrial concentrator building of approximately 6,700 m². Scope covered architecture, steel structure with all connections, and foundation with full reinforcement.
Client request
What they asked for
High-detail modeling to resolve interactions between the structure and industrial equipment, followed by coordinated 2D drawings at the end.